Supporting R&D · public supporting rd
RF+B Symbiotic HPU
Optional remote power R&D · supporting HyphaOps Creek Take-Up
New-design hydrogen power unit research path with radio frequency (RF) and magnetic field (B) as first-class systems, measured against energy logs and a safety gate ladder — optional remote power for far-from-grid creek intake only after gates close.
R&D program · supporting brief published · HempDaddy Media
Creek Take-Up fit
When intake sits far from grid, measured hydrogen power R&D is a long-path option for pumps and sensors — only after gates G1–G5. The living water loop ships without it.
Open Creek Take-Up living water loop →What it is
- HPU-class research path: H₂ → electrical export alongside RF + B process control under recipe
- Supervisory control with interlocks, schedules, and run logs
- Gas discipline and RF inhibit when detectors say the bay is not healthy
- Performance claims require logged energy (power in, useful out, RF energy)
What it is not
- Not free energy or over-unity
- Not a copy of any commercial HPU brand IP
- Not road-legal or site-legal hardware until certification and site approvals close
- Not controlled from a public cloud portal for safety trips
- Not required for Creek Take-Up to operate
Gates G0–G5
Risk rises only as evidence closes. Software green is not the same as site-legal hardware.
- G0sim greenphysical n/a
Concept
Package + offline sim e2e; hazard register started
- G1sim greenphysical open
Bench RF+B
Shielded bench, no H₂, metered RF/B, door/e-stop kill RF
- G2sim drillphysical open
Cold H₂
Detectors, vent, SOP; gas→RF inhibit; no RF+H₂ together
- G3sim storyboardphysical open
Hot low power
Limited combined RF + controlled H₂ under written limits
- G4sim plannedphysical open
Full envelope
Power target under formal cert and third-party lab plan
- G5sim plannedphysical open
Field pilot
Site AHJ approval + insurance; staged media only if cleared
Hard rules
- No over-unity claims.
- Safety chain hardwired for RF enable; software monitors, does not replace.
- Gas alarm forces RF off.
- No RF with unknown gas concentration.
- Energy claims need run logs.
- Create → stage → clear → publish for any public face.
Parallel tracks
Mechanical · EMC · Control & interlocks · Certification · Simulation
Each track keeps its own evidence. None signs another's certificate. Control plane stays on HQ / local PLC network — not the public droplet for safety trips.
Disclaimer
Not legal advice. Not a product certificate. Not an offer for sale. Not freenergy.