Skip to main content
TRI-COUNTY HEMP PORTAL · WI INFRASTRUCTURE

Plan Wisconsin farm infrastructure permits

Licensed hemp growers often need DNR waterway permits, county zoning, and building paths before irrigation ponds, creek crossings, or processing buildings. This portal provides a step-by-step checklist and document categories you can mirror on your own parcel. Register free to track checklist progress; subscribe for full USDA lot and grant workspaces on the same account.

How this site helps you

Agency filing still happens on official government sites — this portal keeps your document structure and checklist progress in one place.

  • Permit paths in plain language

    Pond impoundment, creek crossing, pump house, and processing facility scopes are split into separate project cards with typical agency questions.

  • Document vault folders that match permits

    DNR site plans, engineer drawings, correspondence, and county zoning categories are pre-labeled — upload once and reuse across checklists.

  • Checklist tracking when you register

    Mark required permit documents as they land in your library instead of losing track in email threads.

  • Example site layout pattern

    See how one farm might split creek access, irrigation, and processing zones — substitute your own maps and parcel identifiers.

  • Same portal as USDA hemp compliance

    Infrastructure planning pairs with federal lot records, FSA forms, and grant exports — one account, not another silo.

Roadmap at a glance

Five steps to use this roadmap on your own farm — official applications stay on DNR and county sites.

  1. PHASE 1
    Confirm which agencies apply

    Resolve DNR waterway path, county zoning, floodplain/shoreland, and whether USACE Section 404 coordination is needed before paying full fees.

  2. PHASE 2
    Split building projects clearly

    Treat site access, irrigation/pump house, and processing facility as separate permit and budget conversations.

  3. PHASE 3
    Map your layout

    Use the example site plan pattern for creek crossing, irrigation zone, and processing pad — upload your annotated map to the matching vault category.

  4. PHASE 4
    Upload into vault categories

    Each permit path lists document categories that match Documents in this portal — no reinventing folder names per agency.

  5. PHASE 5
    Track checklists & grow into workspaces

    Registered members mark items complete as files arrive; subscribers add USDA lot compliance and grant export tools on the same account.

Loading roadmap…

External agency context (reference only)

Wisconsin DNR and county staff work on their own official sites. Use the links below for citations — this portal keeps your costs, documents, and checklists.

Permit checklists and document vault structure on this site; USDA licensing and FSA lots in the compliance workspaces below.

Federal hemp program (7 CFR 990)USDA lot complianceBusiness grantsFree registrationAll services

HyphaOps mail: [email protected]

Public contact: [email protected]. Geometry/Vision add-ons alone do not include a subscriber mailbox.

Plan Wisconsin farm infrastructure permits | TCHR